News

Read the latest updates and announcements from CDG.

More News

1st Quarter 2021 Newsletter

1st Quarter 2022 Newsletter

2nd Quarter 2021 Newsletter

3rd Quarter 2021 Newsletter

CDG Designs SPB Foundations for MSD Project Clear

First Section of Cedar Rapids Reach 1 Flood Protection Complete

MRFs Requirement of the Transparency in Coverage Rule

Video Series – Episode 1 – Seismic Design Considerations

Video Series – Episode 2 – Integrated Resource Planning

Video Series – Episode 3 – Renewables

Technology Drive Bridge and Dardenne Greenway Connection

June 29, 2026

The Missouri Department of Transportation (MoDOT) and the City of O’Fallon, Missouri teamed up to replace the existing Technology Drive bridge on I-64 North. This initiative combined the City’s need for a pedestrian trail across Dardenne Creek and MoDOT’s need to update the bridge infrastructure.

CDG served as the prime consultant to design the replacement bridge, including a new shared use path connecting to Great Rivers Greenway’s Twin Island Trailhead – the newest section of the Dardenne Greenway.

Shared Use Path Along Technology Drive Bridge

The design combined the pedestrian and vehicular bridge into one structure, which reduced construction schedule and cost, and minimized environmental disruption. The updated structure features a total bridge width of approximately 56 feet with a 14-foot-wide shared use path.

The shared use path leads to the new Twin Island Trailhead, with connections to the Barat Haven/Bluebird trails on the Dardenne Greenway. An underpass trail was also provided for the O’Fallon bike loop on MasterCard Boulevard, which crosses under the replacement bridge and three existing bridges for a possible future connection on the west side of I-64.

The grand opening of the Twin Island Trailhead was celebrated in June of 2026. The bridge and trailhead are currently open for use.

How can we help?